https://www.news24.com/news24/investigations/kusile-crisis-eskom-in-urgent-bid-to-prevent-220m-tall-chimney-collapse-restore-much-needed-megawatts-20230124
Crisis meetings are under way at Eskom to find ways to prevent the collapse of a 220-metre-tall chimney at Kusile Power Station – and to try and find temporary solutions to restore 2 100 megawatts of generation capacity to the grid.
Create an account or login to join the discussion