https://www.smh.com.au/national/nsw/after-bondi-pavilion-s-48-million-makeover-it-hasn-t-got-enough-power-20230217-p5clic.html
Waverley Council has installed a diesel generator and closed part of the pavilion for repairs – only six months after it reopened following a massive makeover.
Create an account or login to join the discussion