https://www.bostonglobe.com/2023/08/24/metro/ashmont-branch-mattapan-line-two-week-shutdown/
The MBTA will suspend service on the Red Line’s Ashmont branch and Mattapan Line for more than two weeks in October to repair tracks and speed trains.
Create an account or login to join the discussion