https://www.wcvb.com/article/mbta-speed-restrictions-plan-green-line-tunnel-repair/45788492
Repairing the tunnels will require another shutdown of the trunk of the Green Line before the end of the year, Eng said. It's part of a new repair plan that will stretch through 2024.
Create an account or login to join the discussion